For buyers and their consultants
Due Diligence
Every approval, certification and report on file for the property, in one place. Documents open as PDFs.
Infrastructure
Utilities, driveway and trails
- PowerPG&E poles along the property edge
- DistributionTrenching to the well and both building sites, shared with water lines
- SolarAn option for the well and the upper site
- DrivewaySchematic plan and cross-sections drawn
Power, water, road access, wastewater and telecom are what a buyer has to solve on raw land. The power line already runs along the property. Getting it to the well and both building sites means trenching, which can be combined with the water lines and, later, the internal trails.

Approved 2022
Design review
Designing a house in Sonoma County takes architects, engineers, planners and the owner working in step. This property has a complete package that has been through design review, with an Administrative Design Permit approved in 2022 for a modern architectural home.
Approved preliminary plans are available on request from Mary Kelley.

Permit approved September 2022
Septic
- CapacitySix bedrooms
- SystemNon-standard drip dispersal
- StatusDesign and permit approved, September 2022

Drilled 2005 · Certified 2022
Well and water
- Depth465 feet, drilled 2005
- 2013 yield7.5 gallons per minute
- 2022 yield6.5 gpm, measured during the drought
- County minimum2.5 gpm
- Water qualityHard, with slightly elevated manganese
The yield is well above what the county requires for a home and landscaping. The pump wiring and breaker are already in the casing; it needs only a permanent power connection. The water is hard and a little high in manganese, which a standard treatment system handles.


County file GRD22-0090
Grading
Grading plans with soils reports, fire review and the drainage report, all filed in 2022.
Two reports
Geotech
California requires a geologic evaluation before building. There are two. The RGH report is an overview that recommended further work. The Bauer report followed up with four test pits and found the soils suitable for a variety of conventional foundations, with monitoring during construction to confirm field conditions.
Boundaries
Survey
The parcel is a long, narrow rectangle running from the floor of Dry Creek Valley to a point about 300 feet higher. The southern boundary is irregular and roughly follows Nidva Lane.